By Contractor Type
GENERAL CONTRACTOR
- Use to ensure the building is being built to the plan, use as QA
- Use to communicate with owner about design decisions and VE
- Photograph when something is wrong
- Trade coordination and sequencing
- Estimation and bidding
CONCRETE
- During Install - ensuring correct placements
- Post Install - QA of Embed Placement and Number
- QA of floor penetrations (where electrical, plumbing go through the floors)
FRAMING
- Identifying missing blocking for placement of sinks in commercial facilities
- Identification of a human error in rotation of the plan early during framing instead of after trades and drywall comes in
- Tie ins
- Ceiling prefab coordination
- Ceiling boom bounce
MECHANICAL
- Previewing the Mechanical systems first as they’re often the ones that cause knock-on effects to other trades